| Login
dc.contributor.author | Rahman, Hussein Areefur | |
dc.contributor.author | Islam, Shehroze | |
dc.date.accessioned | 2017-11-06T05:38:00Z | |
dc.date.available | 2017-11-06T05:38:00Z | |
dc.date.issued | 2016-11-20 | |
dc.identifier.citation | Ahmad, A., Mehra, S. & Pletcher, M., 2004. The perceived impact of JIT implementation on firms' financial/growth performance. Journal of Manufacturing Technology Management, 15(2), pp. 118-130. Birgün Barla, S., 2003. A case study of supplier selection for lean supply by using a mathematical model. Logistics Information Management, 16(6), pp. 451-459. Canel, C. a. R. D. a. A. E. A., 2000. Just-in-time is not just for manufacturing: a service perspective. Industrial Management & Data Systems, 100(2), pp. 51-60. Chase, R. B. a. A. N. J. a. J. F. R., 1995. Production and operations management: manufacturing and services. s.l.:Irwin Chicago. Chong, H. a. W. R. E. a. P. V., 2001. Relationship among organizational support, JIT implementation, and performance. Industrial Management \& Data Systems, 101(6), pp. 273-281. Chun Wu, Y., 2003. Lean manufacturing: a perspective of lean suppliers. International Journal of Operations & Production Management, 23(11), pp. 1349-1376. Conner, G., 2001. Lean manufacturing for the small shop. s.l.:Society of Manufacturing Engineers. Daugherty, P. J. a. R. D. S. a. S. M. S., 1994. Just-in-time functional model: empirical test and validation. International Journal of Physical Distribution & Logistics Management, 24(6), pp. 20-26. 35 Direction, S., 2004. Successful cost reduction methodologies: World leading manufactures highlight tools and techniques for achieving major cost reduction. Strategic Direction, 20(4), pp. 31-33. Emiliani, M., 2001. Redefining the focus of investment analysts. The TQM Magazine, 13(1), pp. 34-51. Evans, S. a. J. S., 2000. Improving co-development through process alignment. International Journal of Operations & Production Management, 20(8), pp. 979-988. Flinchbaugh, J., 2004. Beyond lean: building sustainable business and people success through new ways of thinking. Lean Learning Center. Fullerton, R. R. a. M. C. S., 2001. The production performance benefits from JIT implementation. Journal of operations management, 19(1), pp. 81-96. Hines, P. a. R. N., 1997. The seven value stream mapping tools. International journal of operations & production management, 17(1), pp. 46-64. Imai, M., 1997. Gemba kaizen: a commonsense, low-cost approach to management. s.l.:McGraw Hill Professional. Islam, S., 2001. The Textile and Clothing Industry of Bangladesh in a Changing, Dhaka: Centre For Policy Dialogue and the University Press. Karlsson, C. a. P. Å., 1996. Assessing changes towards lean production. International Journal of Operations & Production Management, 16(2), pp. 24-41. Kobayashi, I., 1990. 20 Keys to workplace improvement. s.l.:Productivity Pr. 36 Kok Lim, K. a. A. P. K. a. Z. M., 1999. Managing waste and looking beyond: the IMI approach. The TQM Magazine, 11(5), pp. 304-310. Krajewski, L. a. R. L., 2001. Operations Management: Strategy and Analysis. 6 ed. s.l.:Prentice Hall. Lewis, M. A., 2000. Lean production and sustainable competitive advantage. International Journal of Operations & Production Management, 20(8), pp. 959-978. Merchandiser, A., 2015. Readymade Garments Industry of Bangladesh, s.l.: http://www.garmentsmerchandising.com/. Miltenburg, J., 2001. U-shaped production lines: A review of theory and practice. International Journal of Production Economics, 70(3), pp. 201-214. Monden, Y., 1983. Toyota production system: practical approach to production management. s.l.:Engineering & Management Press. Monden, Y., 1983. Toyota Production System: Practical Approach to Production Management, Atlanta, GA: Industrial Engineering and Management Press. Nakajima, S., 1988. Introduction to TPM: Total Productive Maintenance. s.l.:Productivity Press. O'hEocha, M., 2000. A study of the influence of company culture, communications and employee attitudes on the use of 5Ss for environmental management at Cooke Brothers Ltd. The TQM Magazine, 12(5), pp. 321-330. Paul Brunet, A. a. N. S., 2003. Kaizen in Japan: an empirical study. International Journal of Operations & Production Management, 23(12), pp. 1426-1446. 37 Rajam Ramaswamy, N. a. S. V. a. G. A., 2002. Just-in-time implementation in small and medium enterprises. Work Study, 51(2), pp. 85-90. Ramaswamy, N. S. V. a. G. A., 2002. Just-in-time implementation in. Work Study, 51(2), pp. 85-90. Rawabdeh, I., 2001. An investigation of the potential of implementing just-in-time in Jordan. s.l., 7th International Conference on Production Engineering, Design an Control, Alexandria. Shingo, S., 1992. The Shingo production management system: improving process functions. s.l., Productivity Press Portland, OR. Strategic Direction, 2004. Successful cost reduction methodologies. Strategic Direction, 20(4), pp. 31-3. Svensson, G., 2001. Just-in-time: the reincarnation of past theory and practice. Management Decision, 39(10), pp. 866-879. Swanson, C. A. a. L. W. M., 1998. Just-in-time manufacturing. Business Process Management Journal, 4(4), pp. 333-341. Toyoda, E., 1987. Toyota: First 50 Years in Motion. Tokyo: Kodansha International. Womack, J. P. &. J. D. T., 1996. Lean thinking: Banish waste and create wealth in your corporation. London: Simon and Schuster. Wu, Y., 2003. Lean manufacturing: a perspective of lean suppliers. International Journal of, 23(11), pp. 1349-76. 38 Yasin, M. M. a. W. M. a. S. M. H., 2004. Benchmarking JIT: an analysis of JIT implementations in the manufacturing service and public sectors. Benchmarking: an international journal, 11(1), pp. 74-92. Yin, R., 2013. Case Study Research: Design and Methods. 2nd ed. s.l.:SAGE Publications | en_US |
dc.identifier.uri | http://hdl.handle.net/123456789/148 | |
dc.description | Supervised by Prof. Dr. Shamsuddin Ahmed Department of Mechanical and Chemical Engineering (MCE) Islamic University of Technology (IUT) | en_US |
dc.description.abstract | In the competitive global market, the position of garments industry, the most important remittance-earning industry, is deteriorating by day due to numerous reasons one of which being increase in cost. To keep up with challenges like increased compliance enforcement and quality demand, the traditional ways are failing to keep a sustainable production environment in this industry. For maintaining a sustainable production environment, it has become an absolute necessary to reduce waste in production system to the minimum. This study concerns with a case study that attempts to address different factors standing in the way of waste reduction in garments industry, the prevalent categories of wastes in the industry and practical measures and guidelines for the solution. Since the study was limited to a single export-oriented garments factory, the findings may not prove accurate for making generalized conclusions. Further study is necessary for determining comprehensive measures. | en_US |
dc.language.iso | en | en_US |
dc.publisher | IUT, MCE | en_US |
dc.title | Determining factors hampering the implementation of techniques for the reduction of prominent wastes in export-oriented garments factories: a case study | en_US |
dc.type | Thesis | en_US |