| Login
dc.contributor.author | Razee, Syed Muqsit | |
dc.date.accessioned | 2017-11-23T10:30:18Z | |
dc.date.available | 2017-11-23T10:30:18Z | |
dc.date.issued | 2016-11-20 | |
dc.identifier.citation | Ahmad, A. a. (2004). The perceived impact of JIT implementation on firms' financial/growth performance. Journal of Manufacturing Technology Management , 15 (2), 118-130. Ahmad, A., Mehra, S., & Pletcher, M. (2004). The perceived impact of JIT implementation on firms' financial/growth performance. Journal of Manufacturing Technology Management , 15 (2), 118-130. Birgün Barla, S. (2003). A case study of supplier selection for lean supply by using a mathematical model. Logistics Information Management , 16 (6), 451-459. Canel, C. a. (2000). Just-in-time is not just for manufacturing: a service perspective. Industrial Management & Data Systems , 100 (2), 51-60. Chase, R. B. (1995). Production and operations management: manufacturing and services. Irwin Chicago. Chong, H. a. (2001). Relationship among organizational support, JIT implementation, and performance. Industrial Management \& Data Systems , 101 (6), 273-281. Chun Wu, Y. (2003). Lean manufacturing: a perspective of lean suppliers. International Journal of Operations & Production Management , 23 (11), 1349-1376. Conner, G. (2001). Lean manufacturing for the small shop. Society of Manufacturing Engineers. Daugherty, P. J. (1994). Just-in-time functional model: empirical test and validation. International Journal of Physical Distribution & Logistics Management , 24 (6), 20-26. 47 Direction, S. (2004). Successful cost reduction methodologies: World leading manufactures highlight tools and techniques for achieving major cost reduction. Strategic Direction , 20 (4), 31-33. Emiliani, M. (2001). Redefining the focus of investment analysts. The TQM Magazine , 13 (1), 34-51. Evans, S. a. (2000). Improving co-development through process alignment. International Journal of Operations & Production Management , 20 (8), 979-988. Flinchbaugh, J. (2004). Beyond lean: building sustainable business and people success through new ways of thinking. Lean Learning Center . Fullerton, R. R. (2001). The production performance benefits from JIT implementation. Journal of operations management , 19 (1), 81-96. Hines, P. a. (1997). The seven value stream mapping tools. International journal of operations & production management , 17 (1), 46-64. Imai, M. (1997). Gemba kaizen: a commonsense, low-cost approach to management. McGraw Hill Professional. Islam, S. (2015). Computers and Systems. Elsivier , 273-275. Islam, S. (2001). The Textile and Clothing Industry of Bangladesh in a Changing. Dhaka: Centre For Policy Dialogue and the University Press. Karlsson, C. a. (1996). Assessing changes towards lean production. International Journal of Operations & Production Management , 16 (2), 24-41. Kobayashi, I. (1990). 20 Keys to workplace improvement. Productivity Pr. 48 Kok Lim, K. a. (1999). Managing waste and looking beyond: the IMI approach. The TQM Magazine , 11 (5), 304-310. Krajewski, L. a. (2001). Operations Management: Strategy and Analysis (6 ed.). Prentice Hall. Lewis, M. A. (2000). Lean production and sustainable competitive advantage. International Journal of Operations & Production Management , 20 (8), 959-978. Merchandiser, A. (2015). Readymade Garments Industry of Bangladesh. http://www.garmentsmerchandising.com/. Miltenburg, J. (2001). U-shaped production lines: A review of theory and practice. International Journal of Production Economics , 70 (3), 201-214. Monden, Y. (1983). Toyota production system: practical approach to production management. Engineering & Management Press. Monden, Y. (1983). Toyota Production System: Practical Approach to Production Management. Atlanta, GA: Industrial Engineering and Management Press. Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Productivity Press. O'hEocha, M. (2000). A study of the influence of company culture, communications and employee attitudes on the use of 5Ss for environmental management at Cooke Brothers Ltd. The TQM Magazine , 12 (5), 321-330. Paul Brunet, A. a. (2003). Kaizen in Japan: an empirical study. International Journal of Operations & Production Management , 23 (12), 1426-1446. 49 Rajam Ramaswamy, N. a. (2002). Just-in-time implementation in small and medium enterprises. Work Study , 51 (2), 85-90. Ramaswamy, N. S. (2002). Just-in-time implementation in. Work Study , 51 (2), 85-90. Rawabdeh, I. (2001). An investigation of the potential of implementing just-in-time in Jordan. 7th International Conference on Production Engineering, Design an Control, Alexandria. Shingo, S. (1992). The Shingo production management system: improving process functions. Productivity Press Portland, OR. Strategic Direction. (2004). Successful cost reduction methodologies. Strategic Direction , 20 (4), 31-3. Svensson, G. (2001). Just-in-time: the reincarnation of past theory and practice. Management Decision , 39 (10), 866-879. Swanson, C. A. (1998). Just-in-time manufacturing. Business Process Management Journal , 4 (4), 333-341. Toyoda, E. (1987). Toyota: First 50 Years in Motion. Tokyo: Kodansha International. Womack, J. P. (1996). Lean thinking: Banish waste and create wealth in your corporation. London: Simon and Schuster. Wu, Y. (2003). Lean manufacturing: a perspective of lean suppliers. International Journal of , 23 (11), 1349-76. Yasin, M. M. (2004). Benchmarking JIT: an analysis of JIT implementations in the manufacturing service and public sectors. Benchmarking: an international journal , 11 (1), 74-92. 50 Yin, R. (2013). Case Study Research: Design and Methods (2nd ed.). SAGE Publications | en_US |
dc.identifier.uri | http://hdl.handle.net/123456789/163 | |
dc.description | Supervised by Prof. Dr. Shamsuddin Ahmed Department of Mechanical and Chemical Engineering(MCE) Islamic University of Technology(IUT) | en_US |
dc.description.abstract | Warehouse layout is a classical production problem in engineering environment. Warehouse design often has a significant impact on the performance of a manufacturing plant. In modifying the warehouse floor layout, main issue that needs to be concerned is the impact on system performance due to the changes made. Improvements in terms of time delays, frequency of material flows and efficiency of line will contribute to the reduction of production cost. Neither an algorithmic nor a procedural layout design approach is usually an effective way in solving a practical layout problem. This paper applied the simple procedural methodology for the generation of suggested system, namely Systematic Layout Planning (SLP) approach. This approach analyses the layout problems through the usage of easy understanding analytical tools. The suggested system focuses on the redesigning of the workstations for more visible value adding workstation arrangement in the warehouse. The system was evaluated through the line balancing issue and space distribution. Changing material handling equipment and space arrangement of all the equipment directly improves of flow within the warehouse. Implementation of a new layout is a time consuming process and a big investment is required for making the changes. Even no practical analysis is possible for observing the improvement(s) made, hence the improvement was proved through a heuristic way in this project | en_US |
dc.language.iso | en | en_US |
dc.publisher | IUT, MCE | en_US |
dc.title | Redesigning of a warehouse facility layout for improving the inventory management system: a case study | en_US |
dc.type | Thesis | en_US |