A Case Study: Implementation of Lean Tools to Reduce Lead Time in a Cable Manufacturing Company in Bangladesh

Show simple item record

dc.contributor.author Mahmud, Raihan
dc.date.accessioned 2020-12-14T07:43:20Z
dc.date.available 2020-12-14T07:43:20Z
dc.date.issued 2019-11-15
dc.identifier.citation [1] G.Muthukumaran, V.S.K.Venkatachalapathy, K.Pajaniradja, "Impact on integration of Lean Manufacturing and Six Sigma in various applications - a review," IOSR Journal of Mechanical and Civil Engineering, vol. 6, no. 1, pp. 98-101, Mar. - Apr. 2013. [2] Prem S. Kukreja, Dr. A. G. Matani, Dr. S.K. Doifode “Analysis of Production Processes in a Small ScaleFoundry Industry” International Conference On Emanations in Modern Technology and Engineering (ICEMTE-2017) ISSN: 2321-8169 Volume: 5 Issue: 3 [3] McIntosh, R.I., Culley, S.J., Mileham, A.R., Owen, G.W., 2001.Changeover improvement: A maintenance perspective. International Journal of Production Economics 73, pp. 153-163. [4] Liker, Jeffrey L., 2006. The Toyota Way: 14 Management principles from the World's Greatest Manufacturer. Free Press division from Simon & Schuster, Inc., New York. [5] McIntosh, R.I., Culley, S.J., Mileham, A.R., Owen, G.W., 2000. A critical evaluation of shingo’s SMED) methodology. International Journal of Production Research 38, pp. 2377-2395. [6] Coimbra, E. A., 2009. Total Flow Management: Achieving Excellence with Kaizen and Lean Supply Chains. Kaizen Institute. [7] Shingo, S., 1985. A revolution in manufacturing: The SMED system. Productivity Press, Stanford, CT. [8] Womack J. P, Daniel T. Jones, and Daniel Roos, The Machine that Changed the World, HarperCollins, 1990. [9] Shingo Shigeo, NY- 1989. A Study of The Toyota Production System, Productivity Press, pp. 41 -57 [10] Schonberger R. J., World Class Manufacturing The lessons of simplicity applied, 2008, pp. 1- 6, 17-30 [11] NIST-MEP , 2000. Lean, Lean Certificate Series, NIST Manufacturing Extension Partnership, Gaithersburg, MD, NIST. [12] Creehan K. D., and Taylor R E, summer 2003. Lean Manufacturing and Six-Sigma Integration, Flexible Automation and Lean Manufacturing, Center for High Performance Manufacturing, Center-Designated Project,. [13] Womack J. P. and Jim, Getting Started on the Lean Journey [14] Taninecz George., 2005, Lean Beyond Production, LEI, Brookline, pp. [15] Rother M., and Shook J., 2003.Learning to See Value Stream Mapping to Create Value and Eliminate Muda, The Lean Enterprise Institute, en_US
dc.identifier.uri http://hdl.handle.net/123456789/714
dc.description Supervised by Prof. Dr. Shamsuddin Ahmed Professor Department of Mechanical and Production Engineering Islamic University of Technology (IUT) en_US
dc.description.abstract Every small scale company has an effect on the industrial economy of a country and the world if broadly speaking. Globalization, updating technology, and higher competition have a big impact on small scale companies. These companies need to update their production management methods to reach economic, social and environmental development without making extensive changes. Most small scale companies are even unaware of lean manufacturing tools that exist today. The target of this study is the implementation of ‘Lean tools’ in a small scale company to increase productivity through effective workplace management. The purpose of this study is to understand the effect of lean manufacturing tools like SMED, 5s in plant management, material movement in a cable manufacturing company to understand how productivity and efficiency is changing. The methodologies used in the study are SMED in wire-drawing RBD machine, 5s in workplace rearrangement, plant layout for reducing lead time. The study reveals that lean tools are vital for this cable company. After implementing SMED in wire-drawing RBD machines and optimizing the layout, lead time was reduced by 26% hence profit margin will grow. This literature adds value to the research of lean tools by giving an insight into the implementation of lean tools in cable companies. The tools are implemented only for a static working condition without taking any unforeseen causes into account for delay. en_US
dc.language.iso en en_US
dc.publisher Department of Mechanical and Production Engineering, Islamic University of Technology, Gazipur, Bangladesh en_US
dc.title A Case Study: Implementation of Lean Tools to Reduce Lead Time in a Cable Manufacturing Company in Bangladesh en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search IUT Repository


Advanced Search

Browse

My Account

Statistics