Factors affecting labor productivity of the construction workers in Bangladesh

Show simple item record

dc.contributor.author Toha, Rubayet Monzur
dc.contributor.author Raju, Istiyak Ahmed
dc.contributor.author Mohammad, Towsif
dc.date.accessioned 2021-09-09T04:38:27Z
dc.date.available 2021-09-09T04:38:27Z
dc.date.issued 2013-11-15
dc.identifier.citation Alinaitwe HM, Mwakali JA and Hansoon B. (2007): "Factors Affecting the Productivity of Building Craftsmen-Studies of Uganda." Journal of Civil Engineering and Management, XIII, 169-176. Baba, K. (1995)"Cultural Influences on Construction Management."1st International Conference on Construction Project Management. Singapore. Enshassi, A., S. Mohamed, ZA Mustafa, and PE Mayer (2007): "Factors Affecting Labour Productivity in Building Projects in the Gaza strip." Journal of Civil Engineering and Management XIII, no. 4, 245-254. Hanna, AS, CK Chang, KT Sullivan, and JA Lackney (2008): "Impact of Shift Work on Labor Productivity for Labor Intensive Contractor." Journal of Construction Engineering and Management 134, no. 3 197-204. Hanna, AS, CS Taylor, and KT Sullivan (2005): "Impact of Extended Overtime on construction Labor Productivity." Journal of Construction Engineering and Management 131, no. 6, 734-739. Ibbs, W. "Impact of Change's timing on Labor Productivity." Journal of Construction Engineering and Management 131, no. 11 (2005): 1219-1223. Jergeas, Dr. George (2009)."Improving Construction Productivity on Alberta Oil and Gas Capital Projects." Kaming, PF, P Olomolaiye, GD Holt, and FC Harris (1997): "Factors Influencing Craftmen's Productivity in Indonesia." International Jornalof Project Management 15, no. 1, 21-30. Kaming, PF, P Olomolaiye, GD Holt, and FC Harris (1998): "Severity Diagnosis of Productivity Problems - a reliability analysis." International Journal of Project Management 16, no. 2, 107-113. Civil and Environmental Engineering 43 Kazaz, A., E. Manisali, and S. Ulubeyli (2008): "Effect of Basic Motivational Factors on Construction Workforce Productivity in Turkey." Journal of Civil Engineering and Management 14, no. 2, 95-106. Khoramshahi, F., R. Dehghan, and MM Mortaheb (2006): "Factors Influencing Construction Productivity." 10th EASEC. Bangkok. Langford, D., MR Hancock, R. Fellows, and AW Gale (1995): "Human Resources Management in Construction." Longman Scientific and Technical. Lema, NM (1995):"Construction of Labour Productivity modeling." University of Dar Elsalaam. Lim, EC, and J. Alum (1995): "Construction Productivity: Issues encountered by COntractors in Singapore." Internation Journal of Project Managemnet 13, no. 1, 51-58. Makulsawatudom, and Emsley (2002): "Critical factors influencing construction productivity in Thailand." 10th International Symposium Construction Innovation and Competitiveness. Ohio. Manjeri, Sunil (2011) "Construction Productivity." www.slideshare.net. http://www.slideshare.net/atvisun/construction-productivity. Motwani, J., A. Kumar, and M. Novakoski (1995): "Measuring Construction productivity in Thailand; A practical approach." (Work Study) 44, no. 8, 18-20. Nepal, MP, M. Park, and B. Son (2006): "Schedule Pressure on Construction Performance." Journal of Construction Engineering and Management 132, no. 2, 1820188. Olomolaiye, P., A. Jayawardane, and F. Harris (1998): "Construction Productivity Management." Chartered Institution of Building. Sanders, SR, and HR Thomas(1991): "Factors Affecting Masonary Labor Productivity." Journal of Construction Engineering and Management 117, no. 4, 626-644. Sepsarr (2013):.Productivity.http://en.wikipedia.org/wiki/Productivity. Civil and Environmental Engineering 44 ShouQuing, W. (1999):"Improving Construction Productivity by Management." 1st Conference of CIB TG29. Singapore, 419-429. Soekiman, A., K. Pribadi, B. Soemardi, and R. Wirahadikusumah (2011): "Factors Relating to Labor Productivity Affecting the Project schedule Performance in Indonesia." Procedia Engineering. Thomas, HR. (1992): "Effects of Schedule overtime on Labor productivity." Journal of Construction Engineering and Management 118, no. 1, 60-76. Weng-Tat, C (2007): "A systems perspective of construction productivity Improvement efforts." 1st International Conference of EACEF. Jakarta. Whitepaper; (September, 2007): Factors Affecting Construction Labor Productivity. Intergraph. en_US
dc.identifier.uri http://hdl.handle.net/123456789/907
dc.description Supervised by Dr. Md. Aslam Hossain Assistant Professor Department of Civil and Environmental Engineering (CEE), Islamic University of Technology (IUT), Board Bazar, Gazipur-1704, Bangladesh. en_US
dc.description.abstract Productivity remains an intriguing subject and a dominant issue in the construction sector, promising cost savings and efficient usage of resources. Construction industry faces challenges to improve their productivity and the problems are usually associated with performance of labor if the construction is specially labor intensive. Without adequate and efficient manpower, it is impossible to carry out a construction project. It causes a lot of mishaps and disturbance to the whole construction operation, thus increasing the duration and cost of the project, which may not be feasible for the constructing company or owner. So it needs to be ensured that all the labors are giving their best input for the achievement of the project goals. However, labor’s productivity and efficiency gets affected by some factors. These factors may either motivate the labors for showing better productivity or may demotivate them and stop them from giving their best effort. These factors can be controlled by taking necessary steps by the owner or constructing company. But in order to do so, the factors, that are affecting the building construction labor’s productivity mostly, are required to be identified. But in Bangladesh, this issue has not given much attention. As a result, standard construction of a building in Bangladesh is still very time consuming and costly. This situation has motivated the study to identify, asses and determine the factors those are affecting the labor productivity of building construction sector of Bangladesh. A questionnaire survey has been carried out to get the workers response and point of view about the management facilities of their job, and thus to identify the possible factors that have been affecting their productivity. Labors from various construction sites have been surveyed to get the response of the workers, and through which the factors affecting labor productivity have been identified. The results show that the factors identified have more or less strong impact on labor productivity. It is hoped that the study will be a guideline for various building construction projects to arrange proper management facilities for the labors to improve their productivity which will ensure the feasibility, cost efficiency and minimum duration. en_US
dc.language.iso en en_US
dc.publisher Department of Civil and Environment Engineering, Islamic University of Technology(IUT), Board Bazar, Gazipur, Bangladesh en_US
dc.title Factors affecting labor productivity of the construction workers in Bangladesh en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search IUT Repository


Advanced Search

Browse

My Account

Statistics