Productivity improvement and resource optimization for construction operation using simulation model

Show simple item record

dc.contributor.author Islam, Shafkat
dc.contributor.author Hassan, Md. Jahid
dc.contributor.author Sani, Muzaddir Alfi
dc.date.accessioned 2021-09-09T04:52:01Z
dc.date.available 2021-09-09T04:52:01Z
dc.date.issued 2013-11-15
dc.identifier.citation SK. Nagaraju, B. Sivakonda Reddy, Prof. A. Ray Chaudhuri (2012) "Resource Management in Construction Projects- a case study." IRACST- Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No.4. Centeno, Javier E. (2004) "How Does Management Impact Construction Productivity?". The Graduate college: University of Wisconsin-Stout. Seonghoon Kim, Yong Bai, Yang-Ki Jung, and Dukgeun Yun. ( 2011) "Highway Construction Productivity Measurement with a Wireless Real-Time Productivity Measurement system." Transportation Research Record: Journal of the Transportation Research Board, No.2228, Transportation Research Board of the National Academies, Washington, D.C., pp. 26-33, DOI: 10.3141/2228-04. Arnorsson, Haraldur. (January, 2012.)"Optimizing the Information Flow on the Construction Site.", Master‘s Thesis. Faculty of engineering and science: Aalborg University. Hassan, M. M., Ph.D. "Estimation of Concrete Paving Construction Productivity Using Discrete Event Simulation." Bradley University. Page, I.C. (2010)"Construction Industry Productivity." Study Report. S.P. Dozzi, P.Eng. and S.M. AbouRizk, Ph.D., P.Eng. (December, 1993)"Productivity in Construction." Shu-Shun Liu, Chang-Jung Wang. (August, 2006)"Optimization for Resource Assignment Problems of Linear Construction projescts,". ELSEVIER: Automation in Construction 16 (2007) 460-473. The Modular Building Institute, USA. "Improving Construction Effeciency & Productivity With Modular Construction ." Civil and Environmental Engineering 55 Zaneldin, E. K. (June, 2008)"Resource Optimization of Construction Operations Using AOA-Based Simulation". Int j simul model 7 (2008) 3, 146-157. Muthuramalingam, Jayakumar. (November, 2008)"Effective Resource Management in Construction Industries for Success." Vol.2, No.6. School of Engineering and Science, Curtin University Technology. Fayyed, Tahreer Mohammed. (2010)"Optimizing the Schedule of Resource-Constrained Construction Projects Using Genetic Algorithms." Islamic University of Gaja. PEng, Dr. George Jergeas. (May, 2009)"Improving Construction Productivity on Alberta Oil and Gas capital Projects." University of Calgary, Alberta, Canada. Team, CEFRIO Project. (September, 2011)"Improving Effeciency and Productivity in the Construction Sector Through the Use of Information Technologies." en_US
dc.identifier.uri http://hdl.handle.net/123456789/908
dc.description Supervised by Dr. Md. Aslam Hossain Assistant Professor Department of Civil and Environmental Engineering (CEE), Islamic University of Technology (IUT), Board Bazar, Gazipur-1704, Bangladesh. en_US
dc.description.abstract A series or parallel completion of different independent or dependent activities carries out a construction operation. These activities sometimes require common resources which make it difficult to schedule the construction operation effectively. Eventually it leads inefficient use of resources which lengthen the project duration and increase cost. Therefore improving construction productivity to reduce duration and cost is very important for a construction project. Total Ineffective Time of a construction project can be minimized through proper planning and scheduling prior to construction. Additionally, it would also help the project manager to choose from different alternative plans on the basis of suitable cost. Manual calculation and planning is complicated and time consuming considering the interaction of different work activities, resources and lengthiness of the project. This situation has motivated the study to figure out the usefulness of simulation models for minimizing project duration and cost. Simulation models can be an efficient tool to generate effective plans and schedules as they consider complex interactions among various units on the jobsite to evaluate the performance of the construction operation. A simulation model has been developed using STROBOSCOPE simulation language in this study. The model has considered various resource combinations for the analysis. The construction of a real life project has been selected as case project for the study. The construction operation that has been selected for the model development is a RAMP of FLYOVER which consists of earth excavation and sand filling, construction of base foundation, slab casting. Simulation has been run for different combination of resources. The results show that simulation model is very effective to select the optimum combination of resource that produces minimum project duration and cost. It is hoped that the study will be a guideline for the construction projects to ensure minimum duration and cost. en_US
dc.language.iso en en_US
dc.publisher Department of Civil and Environment Engineering, Islamic University of Technology(IUT), Board Bazar, Gazipur, Bangladesh en_US
dc.title Productivity improvement and resource optimization for construction operation using simulation model en_US
dc.type Thesis en_US