Productivity Improvement through Minimizing Idle Time of Construction Resource Using Simulation Model

Show simple item record

dc.contributor.author Rahim, M Rifat Ibtesham
dc.contributor.author Solaiman, Md. Sakif Bin
dc.contributor.author Sarkar, Md. Tanvir Ahmed
dc.date.accessioned 2021-09-13T05:26:21Z
dc.date.available 2021-09-13T05:26:21Z
dc.date.issued 2014-11-15
dc.identifier.citation SK. Nagaraju, B. Sivakonda Reddy, Prof. A. Ray Chaudhuri (2012) "Resource Management in Construction Projects- a case study." IRACST- Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No.4. Centeno, Javier E. (2004) "How Does Management Impact Construction Productivity?". The Graduate college: University of Wisconsin-Stout. Seonghoon Kim, Yong Bai, Yang-Ki Jung, and Dukgeun Yun. ( 2011) "Highway Construction Productivity Measurement with a Wireless Real-Time Productivity Measurement system." Transportation Research Record: Journal of the Transportation Research Board, No.2228, Transportation Research Board of the National Academies, Washington, D.C., pp. 26-33, DOI: 10.3141/2228-04. Arnorsson, Haraldur. (January, 2012.)"Optimizing the Information Flow on the Construction Site.", Master’s Thesis. Faculty of engineering and science: Aalborg University. Hassan, M. M., Ph.D. "Estimation of Concrete Paving Construction Productivity Using Discrete Event Simulation." Bradley University. Chua, D., & Li, G. (2002). “RISim: Resource-Inetaracted Simulation Modeling in Construction.” Journal of Construction Emngineering and Management, ASCE, 128(3): 195-202. Drewin, F. (1982). “Construction Productivity: measurment and improvement through work study.” New-York: Elsevier Science Publishing Co., Inc. Shu-Shun Liu, Chang-Jung Wang. (August, 2006)"Optimization for Resource Assignment Problems of Linear Construction projescts,". ELSEVIER: Automation in Construction 16 (2007) 460-473. The Modular Building Institute, USA. "Improving Construction Effeciency & Productivity With Modular Construction ." 43 J. Hoffman, G., Alfred E., T., Timothy S., W., & Jeffery, D. (2007). “Estimating Performance Time for Construction Projects.” Journal of Management in Engineering, ASCE, 23(4): 193-199. Muthuramalingam, Jayakumar. (November, 2008)"Effective Resource Management in Construction Industries for Success." Vol.2, No.6. School of Engineering and Science, Curtin University Technology. Fayyed, Tahreer Mohammed. (2010)"Optimizing the Schedule of Resource-Constrained Construction Projects Using Genetic Algorithms." Islamic University of Gaja. PEng, Dr. George Jergeas. (May, 2009)"Improving Construction Productivity on Alberta Oil and Gas capital Projects." University of Calgary, Alberta, Canada. Team, CEFRIO Project. (September, 2011)"Improving Effeciency and Productivity in the Construction Sector Through the Use of Information Technologies." Martinez, J., & Ioannou, P. (1999). “ General Purpose System for Effective Construction Simulation.” Journal of Construction Engineering and Management, ASCE, 125(4): 265-276. Zaneldin, E. K. (June, 2008)"Resource Optimization of Construction Operations Using AOA-Based Simulation". Int j simul model 7 (2008) 3, 146-157. en_US
dc.identifier.uri http://hdl.handle.net/123456789/969
dc.description Supervised by Dr. Md. Aslam Hossain, Assistant Professor, Department of Civil and Environmental Engineering (CEE), Islamic University of Technology (IUT), Board Bazar, Gazipur, Bangladesh. en_US
dc.description.abstract A series or parallel completion of different independent or dependent activities carries out a construction operation. These activities sometimes require common resources which make it difficult to schedule the construction operation effectively. Eventually it leads to inefficient use of resources which lengthens the project duration and increases cost. Therefore improving construction productivity to reduce duration and cost is very important for a construction project. Total Ineffective Time of a construction project can be minimized through proper planning and scheduling prior to construction. Additionally, it would also help the project manager to choose from different alternative plans on the basis of suitable combination and cost. Manual calculation and planning is complicated and time consuming considering the interaction of different work activities, resources and lengthiness of the project. This situation has motivated the study to figure out the usefulness of simulation models for minimizing project duration and cost. Simulation models can be an efficient tool to generate effective plans and schedules as they consider complex interactions among various units on the jobsite to evaluate the performance of the construction operation. A simulation model has been developed using MS EXCEL 2013 in this study. The model has considered various resource combinations for the analysis. The construction of a real life project has been selected as the case project for the study. The construction operation that has been selected for the model development is the concrete casting of a slab of a building under construction which consists of mixing concrete in mixing machine, hauling the concrete to dedicated floor, vibrating, spreading & finishing. Simulation has been run for different combination of resources. The results show that simulation model is very effective to select the optimum combination of resource that produces minimum project duration and cost. It is hoped that the study will be a guideline for the construction projects to ensure minimum duration and resources while casting of slabs en_US
dc.language.iso en en_US
dc.publisher Department of Civil and Environment Engineering, Islamic University of Technology(IUT), Board Bazar, Gazipur, Bangladesh en_US
dc.title Productivity Improvement through Minimizing Idle Time of Construction Resource Using Simulation Model en_US
dc.type Thesis en_US